Can a First-Time Developer Get Development Finance? 

Yes, a first-time developer can potentially obtain development finance. 

Not every lender will consider a borrower without a completed development track record, and the terms available may differ from those offered to an experienced developer. 

But a lack of previous developments does not automatically prevent a project from being financed. 

The lender will usually look more closely at the complete proposition: 

  • what is being developed; 
  • how complex the project is; 
  • how much equity the developer is contributing; 
  • who will deliver the construction; 
  • the strength of the professional team; 
  • whether the development budget is realistic; 
  • the contingency available; 
  • and how the loan will ultimately be repaid. 

For a first-time developer, the question is therefore not simply: 

“Have you done this before?” 

It is: 

“Does the project have enough experience, capital and structure around it to be delivered successfully?” 

What does a lender mean by a first-time developer? 

Generally, it means someone who does not have an established track record of completing property developments in their own right. 

But experience is rarely binary. 

A borrower may never have been the principal developer while still having substantial experience as a: 

  • property investor; 
  • landlord; 
  • builder; 
  • contractor; 
  • architect; 
  • surveyor; 
  • project manager; 
  • property professional; 
  • or business owner. 

Another applicant may have completed refurbishments but never undertaken a ground-up development. 

The lender should therefore understand what experience exists, not simply whether the borrower can provide a list of previous developments. 

Why do lenders care about development experience? 

Because property development involves execution risk. 

The developer needs to coordinate: 

  • planning; 
  • construction; 
  • contractors; 
  • professional advisers; 
  • costs; 
  • cash flow; 
  • lender drawdowns; 
  • sales; 
  • and the eventual exit. 

Unexpected problems are common. 

A lender therefore wants confidence that someone involved in the project understands how to manage them. 

An experienced developer can demonstrate this through completed schemes. 

A first-time developer needs to establish that confidence in other ways. 

Does every development lender accept first-time developers? 

No. 

Lender appetite varies. 

Some lenders prefer borrowers with an established track record. 

Others may consider first-time developers where the overall proposition is sufficiently strong. 

The relevant lender market can depend on: 

  • development type; 
  • project size; 
  • location; 
  • borrower background; 
  • equity contribution; 
  • professional team; 
  • and proposed leverage. 

This is why development finance should not be approached as a single uniform market. 

Is development finance harder to obtain for a first-time developer? 

It can be. 

An experienced developer can show evidence that they have previously: 

  • completed projects; 
  • managed cost overruns; 
  • worked with contractors; 
  • handled development finance; 
  • and delivered successful exits. 

A first-time developer cannot provide the same evidence. 

The lender may therefore compensate by requiring greater strength elsewhere in the transaction. 

That could mean: 

  • more borrower equity; 
  • lower leverage; 
  • stronger professional support; 
  • greater contingency; 
  • or a less complex first project. 

Does being a first-time developer mean paying a higher interest rate? 

Not necessarily. 

Pricing depends on the complete risk profile and lender. 

Experience can influence that assessment, but so can: 

  • leverage; 
  • property; 
  • location; 
  • development type; 
  • loan size; 
  • term; 
  • and wider borrower strength. 

A first-time developer should therefore not assume that a lack of track record automatically produces a particular rate. 

The more useful objective is to make the overall proposition as financeable as possible. 

What makes a strong first development project? 

Often, simplicity helps. 

A first project involving: 

  • straightforward construction; 
  • clear planning; 
  • realistic costs; 
  • strong local demand; 
  • manageable leverage; 
  • and a clear exit 

may be easier for a lender to assess than an unusually complex development. 

For example, there can be a substantial difference between: 

building two conventional houses on a consented site 

and 

undertaking a major structural conversion of a complicated mixed-use building. 

Both may be viable projects. 

But they present different execution risks for a borrower without a track record. 

Is a smaller first project easier to finance? 

Potentially. 

A smaller scheme may require: 

  • less capital; 
  • fewer contractors; 
  • simpler project management; 
  • and a less complex exit. 

But project size is not the only consideration. 

A small development with: 

  • structural problems; 
  • difficult planning; 
  • unusual construction; 
  • or a highly specialised exit 

can still be challenging. 

The lender is assessing complexity as well as value. 

Can a first-time developer finance a ground-up development? 

Potentially. 

The lender will want to understand how the construction will be managed. 

A strong application might include: 

  • detailed planning consent; 
  • fixed or well-supported construction costs; 
  • experienced contractor; 
  • quantity surveyor; 
  • architect; 
  • appropriate project management; 
  • realistic contingency; 
  • and clear sales evidence. 

The fact that the borrower has not previously completed a ground-up development remains relevant. 

But the project does not need to depend on the borrower personally performing every specialist role. 

Can a first-time developer finance a conversion? 

Potentially. 

Conversions can range from relatively straightforward to highly complex. 

An office-to-residential conversion, for example, may involve: 

  • planning or prior approval; 
  • structural alterations; 
  • fire-safety requirements; 
  • building regulations; 
  • services; 
  • acoustic considerations; 
  • and substantial internal works. 

A first-time developer undertaking this type of project may need a particularly experienced professional and construction team. 

Can a first-time developer finance a refurbishment? 

Potentially. 

A refurbishment can sometimes provide a more manageable entry into development. 

But lenders will distinguish between: 

light refurbishment 

and 

heavy structural development. 

Removing kitchens and redecorating a property presents a different risk from: 

  • substantial extensions; 
  • structural alterations; 
  • change of use; 
  • or complete redevelopment. 

The financing needs to reflect the actual works. 

How important is the developer’s professional background? 

Potentially very important. 

Suppose the borrower is undertaking their first development personally but has spent 15 years working as a construction project manager. 

That is different from someone entering property development with no construction or property experience. 

Similarly, a borrower may have: 

  • operated a building company; 
  • managed a property portfolio; 
  • worked in architecture; 
  • or delivered projects for other developers. 

The lender may take relevant professional experience into account. 

Can experience from property investment help? 

Potentially. 

A landlord or property investor may already understand: 

  • acquisition; 
  • property finance; 
  • valuations; 
  • tenants; 
  • refurbishment; 
  • and asset management. 

That does not make them an experienced developer automatically. 

But it can demonstrate relevant property knowledge. 

The lender will still assess the gap between the borrower’s existing experience and the complexity of the proposed development. 

What if the borrower has development experience but not in their own name? 

This can still be relevant. 

For example, someone may previously have worked: 

  • for another development company; 
  • within a family property business; 
  • as a director of a different development vehicle; 
  • or as part of a joint venture. 

The lender may want evidence of: 

  • their actual role; 
  • projects delivered; 
  • project values; 
  • and responsibilities. 

The quality of the experience matters more than simply appearing on a company record. 

How important is the contractor? 

Very. 

For a first-time developer, an experienced contractor can materially strengthen the delivery proposition. 

The lender may consider: 

  • contractor track record; 
  • financial strength; 
  • experience with similar developments; 
  • proposed contract; 
  • costings; 
  • and programme. 

A developer with limited personal construction experience may rely heavily on the contractor’s ability to deliver. 

Does the contractor need to have completed similar projects? 

It can help considerably. 

If the proposed development is a 20-unit residential conversion, a contractor with a history of delivering similar schemes can provide more confidence than one whose experience is unrelated. 

The lender wants evidence that the team collectively understands the project being undertaken. 

How important is the project manager? 

Potentially very important. 

An experienced project manager can coordinate: 

  • contractors; 
  • programme; 
  • costs; 
  • consultants; 
  • variations; 
  • and progress. 

For a first-time developer, professional project management can help address an obvious experience gap. 

But appointing a project manager should not be treated as a cosmetic exercise. 

The individual needs to have the appropriate experience and a clearly defined role. 

What other professionals may strengthen the application? 

Depending on the project: 

  • architect; 
  • quantity surveyor; 
  • structural engineer; 
  • planning consultant; 
  • project manager; 
  • solicitor; 
  • accountant; 
  • and specialist contractors. 

A development lender may also appoint its own monitoring surveyor. 

The appropriate team depends on the project. 

Does the lender’s monitoring surveyor manage the development? 

No. 

This is an important distinction. 

The lender-appointed monitoring surveyor generally monitors the project for the lender. 

They may report on: 

  • progress; 
  • expenditure; 
  • cost to complete; 
  • programme; 
  • and drawdown requests. 

They are not a replacement for the developer’s own project-management and cost-control functions. 

How important is the development appraisal? 

Fundamental. 

The appraisal should show the economics of the project. 

That may include: 

  • purchase price; 
  • acquisition costs; 
  • construction; 
  • professional fees; 
  • planning-related costs; 
  • finance; 
  • contingency; 
  • selling costs; 
  • GDV; 
  • and anticipated profit. 

For a first-time developer, an unrealistic appraisal can quickly undermine lender confidence. 

How much contingency should a first-time developer include? 

There is no universal percentage appropriate for every development. 

The required contingency depends on: 

  • project type; 
  • stage of design; 
  • construction contract; 
  • existing building condition; 
  • and lender requirements. 

But a first-time developer should be particularly cautious about assuming that the original budget will prove exact. 

Unexpected costs are part of development risk. 

A credible contingency shows that the project has some capacity to absorb them. 

What happens if the development goes over budget? 

The developer may need to contribute additional capital. 

The lender is not automatically obliged to increase its facility because construction becomes more expensive. 

This is particularly important for a first-time developer. 

The lender may ask: 

“If the project needs another £100,000, where will that money come from?” 

The answer should ideally exist before the problem occurs. 

How much money does a first-time developer need to contribute? 

There is no universal deposit or equity requirement. 

The lender may assess: 

  • site purchase; 
  • current value; 
  • total development cost; 
  • GDV; 
  • experience; 
  • and overall leverage. 

A first-time developer may potentially be offered less leverage than a highly experienced borrower on an otherwise comparable scheme. 

But lender criteria vary considerably. 

The important point is that the developer should expect to have meaningful capital at risk. 

Why does developer equity matter? 

Because it provides: 

  • financial alignment; 
  • loss-absorbing capacity; 
  • and evidence of commitment to the project. 

The lender is usually providing only part of the project’s capital. 

The developer’s equity sits behind the debt and absorbs losses first. 

A project funded almost entirely through borrowing can leave very little room if: 

  • costs rise; 
  • values fall; 
  • or the exit is delayed. 

Can existing land equity count as the developer’s contribution? 

Potentially. 

A first-time developer may already own a site. 

Suppose the property was acquired previously and now contains substantial equity. 

A development lender may potentially recognise that value as part of the developer’s contribution, depending on its criteria. 

This can be particularly relevant where planning permission has increased the site’s value. 

Does planning permission help a first-time developer? 

Potentially, substantially. 

Clear, implementable planning removes one major area of uncertainty. 

For a first-time developer, presenting a project with: 

  • full planning; 
  • approved drawings; 
  • sufficiently resolved conditions; 
  • clear build costs; 
  • and credible GDV 

can make the proposition easier to assess. 

Trying to combine first-time development risk with significant planning risk can narrow the lender market further. 

Can a first-time developer get finance without planning permission? 

Potentially, but the financing may be more specialised. 

The borrower might use: 

  • land finance; 
  • bridging finance; 
  • acquisition finance; 
  • or another short-term facility 

while planning is pursued. 

Once planning is sufficiently established, the project may then move onto development finance. 

For a first-time developer, combining limited experience with unresolved planning risk requires particularly careful structuring. 

Does the lender require a fixed-price building contract? 

Not universally. 

Different lenders and projects can use different construction arrangements. 

But the lender will want confidence in the cost plan. 

A well-defined building contract can potentially provide greater certainty. 

The lender may also assess: 

  • contractor financial strength; 
  • variations; 
  • payment schedule; 
  • and contingency. 

The appropriate contract structure should be determined with suitable professional and legal advice. 

What is the role of the quantity surveyor? 

The developer’s quantity surveyor can help with: 

  • cost planning; 
  • tendering; 
  • contractor valuations; 
  • variations; 
  • and cost control. 

For a first-time developer, disciplined cost management can be particularly valuable. 

The lender may separately appoint a monitoring surveyor to report on its behalf. 

These roles should not be confused. 

How do staged drawdowns work for a first-time developer? 

The development portion of the facility will commonly be released progressively rather than all at once. 

The lender may require evidence of: 

  • works completed; 
  • expenditure; 
  • borrower equity invested; 
  • and remaining cost to complete 

before releasing another drawdown. 

A first-time developer therefore needs to understand not only the total loan amount but the timing of the capital. 

Why does working capital matter? 

Because lender drawdowns and contractor payments may not occur at exactly the same time. 

The developer may need enough liquidity to manage the period between: 

  • paying costs; 
  • requesting funds; 
  • monitoring; 
  • and receiving the next lender release. 

This can be overlooked by inexperienced developers. 

A project can have enough finance overall and still experience a cash-flow problem between drawdowns. 

Can the developer use all available cash for the initial deposit? 

That can create risk. 

If every pound of liquidity is committed to the acquisition, little may remain for: 

  • unexpected costs; 
  • drawdown timing gaps; 
  • planning issues; 
  • professional fees; 
  • or construction overruns. 

The funding structure should consider liquidity throughout the project, not simply whether the purchase can complete. 

Can mezzanine finance reduce the cash a first-time developer needs? 

Potentially, but lender appetite may be more limited. 

Mezzanine finance adds another layer of debt behind the senior development lender. 

That increases leverage. 

For a first-time developer, combining: 

  • limited track record; 
  • high senior debt; 
  • and mezzanine borrowing 

may create a risk profile some lenders will not accept. 

A larger equity contribution or equity partner may sometimes create a stronger structure. 

Can an equity investor help a first-time developer? 

Potentially. 

An equity investor can provide: 

  • capital; 
  • financial resilience; 
  • and, in some cases, experience. 

This can be particularly useful where the investor or joint-venture partner has an established development track record. 

The developer may need to share: 

  • profit; 
  • ownership; 
  • and potentially control. 

But the project can benefit from stronger capital and experience. 

Can an experienced joint-venture partner improve the finance case? 

Potentially, significantly. 

Suppose a first-time developer identifies an attractive site but lacks a track record. 

They may partner with an experienced developer who has previously delivered comparable schemes. 

The lender can then assess the experience of the complete borrowing and development team. 

The exact ownership, responsibilities and guarantees still matter. 

Does adding an experienced director solve the problem? 

Not automatically. 

A lender is unlikely to assess experience purely by job title. 

It may want to understand: 

  • who is actually managing the development; 
  • their economic involvement; 
  • responsibilities; 
  • previous projects; 
  • and commitment to the current scheme. 

The structure needs substance. 

Can a first-time developer use a development manager? 

Potentially. 

A professional development manager may provide experience across: 

  • planning; 
  • design; 
  • procurement; 
  • construction; 
  • cost control; 
  • and delivery. 

This can be particularly useful where the borrower is primarily: 

  • an investor; 
  • landowner; 
  • or capital provider 

rather than a construction professional. 

The lender will still assess the borrower and project as a whole. 

Does personal financial strength matter? 

Potentially. 

A lender may consider the developer’s: 

  • assets; 
  • liabilities; 
  • liquidity; 
  • income; 
  • wider property portfolio; 
  • and ability to fund cost overruns. 

A strong personal or corporate balance sheet can provide additional resilience. 

But wealth alone does not replace development competence. 

A well-capitalised borrower can still have a poorly structured project. 

Will a lender require a personal guarantee? 

Potentially. 

Guarantee requirements vary according to: 

  • lender; 
  • borrowing entity; 
  • leverage; 
  • project; 
  • and sponsor strength. 

A first-time developer should not assume that using a limited company means personal exposure is automatically limited to the equity invested. 

The facility and legal documentation need to be understood carefully. 

Do first-time developers normally borrow through an SPV? 

Development projects are frequently undertaken through a special-purpose company, but the appropriate ownership structure depends on the transaction. 

A lender may want a clean borrowing entity that holds the development asset. 

However, company structure has: 

  • legal; 
  • tax; 
  • accounting; 
  • and commercial consequences. 

Those should be considered with suitably qualified advisers rather than established solely around the mortgage. 

Does credit history matter? 

Yes, potentially. 

The lender may review the credit profile of: 

  • borrower; 
  • directors; 
  • shareholders; 
  • and guarantors. 

Minor historic issues do not necessarily prevent development finance. 

But significant: 

  • defaults; 
  • insolvencies; 
  • unpaid debt; 
  • or adverse credit 

can affect lender appetite. 

Context and explanation matter. 

Does income matter for development finance? 

Development finance is not normally assessed in exactly the same way as a residential repayment mortgage. 

The lender’s focus may be more heavily on: 

  • project economics; 
  • security; 
  • developer equity; 
  • experience; 
  • and exit. 

But the borrower’s wider financial position still matters. 

The lender needs confidence that the developer can meet obligations outside the financed development budget. 

How important is the exit strategy for a first-time developer? 

Extremely important. 

The lender needs a credible route to repayment. 

That might be: 

  • individual unit sales; 
  • sale of the completed development; 
  • investment refinance; 
  • or a combination. 

For a first-time developer, a straightforward and well-evidenced exit can strengthen the proposition. 

Is selling the completed property easier than refinancing it? 

Not necessarily. 

The appropriate exit depends on the asset. 

A sale exit requires evidence that: 

  • buyers exist; 
  • pricing is realistic; 
  • and sufficient time is available. 

A refinance exit requires evidence that: 

  • the completed property can support long-term borrowing; 
  • rental income is sufficient where relevant; 
  • and an appropriate lender market exists. 

Neither should be assumed. 

Can a first-time developer retain the finished properties? 

Potentially. 

The development finance could potentially be refinanced onto: 

  • buy-to-let; 
  • multi-unit; 
  • portfolio; 
  • or another investment facility. 

But the long-term refinance should ideally be considered before development begins. 

A completed development does not automatically qualify for enough long-term borrowing to repay the development facility. 

Why does GDV matter? 

GDV means Gross Development Value. 

It is the anticipated value of the completed development. 

The lender may compare its loan against GDV to understand leverage. 

For a first-time developer, conservative and well-supported valuation assumptions can be particularly important. 

An application built around an optimistic GDV can quickly lose credibility. 

Why does loan-to-cost matter? 

Loan-to-cost compares borrowing with the total cost of delivering the project. 

It helps establish how much of the development is being financed through debt and how much through equity. 

Higher leverage means less developer cash is required. 

But it also leaves less financial cushion. 

A first-time developer should not automatically pursue the maximum possible LTC. 

Is maximum leverage a good objective for a first project? 

Not necessarily. 

Using more debt can improve capital efficiency. 

But it can also increase: 

  • interest cost; 
  • sensitivity to overruns; 
  • refinancing pressure; 
  • and lender restrictions. 

A first project may benefit from a more conservative capital structure. 

Successfully completing a well-funded development can be more valuable than stretching the first scheme to its maximum possible leverage. 

What happens if GDV falls during the development? 

The debt does not automatically reduce. 

A fall in completed value can therefore reduce: 

  • developer profit; 
  • equity; 
  • and refinancing capacity. 

A lower-leverage structure generally has more room to absorb that change. 

This is particularly relevant for a first-time developer who has not previously experienced a full market cycle through a development. 

What happens if the project is delayed? 

A delay can increase: 

  • interest; 
  • professional costs; 
  • contractor costs; 
  • and facility-extension risk. 

It can also reduce the time available for the final sale or refinance. 

The original programme should therefore contain realistic allowance for execution. 

An aggressive programme may make an appraisal look stronger while making the real financing less resilient. 

How important is the developer’s exit timetable? 

Very. 

Suppose construction is expected to take 12 months. 

That does not necessarily mean the development loan only needs a 12-month term. 

Additional time may be required for: 

  • delays; 
  • practical completion; 
  • marketing; 
  • conveyancing; 
  • unit sales; 
  • or refinance. 

The finance term should follow the realistic project lifecycle. 

Can development exit finance help a first-time developer? 

Potentially. 

Once the project is complete or near completion, development exit finance may provide a way to: 

  • repay the original development lender; 
  • create additional sales time; 
  • or bridge towards long-term refinance. 

But it should not be treated as guaranteed. 

The first development facility should begin with a credible repayment plan. 

What information will a first-time developer typically need? 

The precise requirements vary, but an application may need: 

  • borrower background; 
  • relevant experience; 
  • project summary; 
  • purchase details; 
  • planning; 
  • approved drawings; 
  • development appraisal; 
  • cost schedule; 
  • professional team; 
  • contractor information; 
  • programme; 
  • valuation; 
  • equity contribution; 
  • assets and liabilities; 
  • and exit strategy. 

Clear presentation matters. 

The lender should be able to understand quickly: 

who is delivering the project, how it will be funded, and how the debt will be repaid. 

Should a first-time developer approach many lenders directly? 

Not necessarily. 

Development lenders can have materially different appetites. 

Sending the same application indiscriminately across the market can be inefficient. 

A better approach is to identify which lenders are genuinely comfortable with: 

  • first-time developers; 
  • the particular project type; 
  • required leverage; 
  • location; 
  • and loan size. 

The objective is lender fit rather than simply lender volume. 

What can weaken a first-time developer’s application? 

Potentially: 

  • unrealistic GDV; 
  • underestimated construction costs; 
  • inadequate contingency; 
  • unclear planning; 
  • inexperienced contractor; 
  • insufficient equity; 
  • excessive leverage; 
  • weak cash reserves; 
  • vague exit; 
  • or an unnecessarily complex first project. 

Any one issue may be manageable. 

Several combined can make the proposition much harder to finance. 

What can strengthen the application? 

Potentially: 

Relevant experience 

Even where it comes from construction, investment or property rather than previous personal developments. 

Experienced professional team 

Particularly where the borrower has gaps in their own experience. 

Clear planning 

Reducing uncertainty before construction. 

Realistic cost plan 

Supported by appropriate professionals and contractors. 

Meaningful equity 

Giving the project financial resilience. 

Adequate contingency 

Allowing for unexpected costs. 

Manageable leverage 

Rather than maximising debt simply because it may be available. 

Credible exit 

Supported by realistic sales or refinancing assumptions. 

Should a first-time developer start with the project or the finance? 

Both need to develop together. 

A project should not be designed solely around what a lender might finance. 

But a developer should understand the financing implications before: 

  • exchanging contracts; 
  • committing substantial planning expenditure; 
  • or starting construction. 

Early funding analysis can reveal whether: 

  • more equity is required; 
  • the professional team needs strengthening; 
  • the proposed scheme is too complex; 
  • or a different lender structure is needed. 

When should a first-time developer seek development finance? 

Ideally before becoming unconditionally committed to an acquisition. 

Early conversations can help establish: 

  • likely lender appetite; 
  • approximate leverage; 
  • expected equity; 
  • experience requirements; 
  • and information needed. 

Formal terms will still depend on due diligence. 

But understanding the likely financing route early can prevent a project being acquired on assumptions the debt market will not support. 

How should a first-time development be structured? 

A useful framework is to consider seven areas. 

1. Project 

Is the first scheme appropriately manageable? 

2. Experience 

What relevant knowledge does the developer already have? 

3. Team 

Who fills the experience gaps? 

4. Capital 

How much equity and liquidity are available? 

5. Construction 

Are the costs, programme and contingency credible? 

6. Finance 

Does the facility provide enough usable capital at the right stages? 

7. Exit 

How will the development lender be repaid? 

Together, these give the lender a more complete picture than the words “first-time developer”. 

How Henry Dannell can help 

At Henry Dannell Private Clients, we approach first-time development finance by looking at the complete proposition rather than treating the absence of a previous development as the only deciding factor. 

We consider: 

the developer’s relevant background; 

the proposed scheme; 

planning position; 

professional team; 

contractor; 

development costs; 

contingency; 

equity contribution; 

working capital; 

GDV; 

and 

the intended exit. 

We can then identify lenders whose appetite is more closely aligned with the borrower and project. 

For one first-time developer, the right structure may involve a relatively straightforward scheme with conservative leverage. 

For another, substantial construction experience may support a more involved project. 

Where the developer has limited delivery experience, an established development manager, contractor or joint-venture partner may materially strengthen the proposition. 

And where the project requires more capital than the developer can comfortably contribute, the answer may involve considering the wider capital structure rather than simply trying to maximise senior debt. 

The objective is not to disguise the fact that this is the borrower’s first development. 

It is to demonstrate why the project can still be delivered successfully despite that limited track record. 

The takeaway 

A first-time developer can potentially obtain development finance. 

But the lender has less historical evidence of delivery to rely upon. 

That places greater emphasis on: 

  • project quality; 
  • relevant experience; 
  • professional team; 
  • construction costs; 
  • contingency; 
  • borrower equity; 
  • liquidity; 
  • leverage; 
  • and exit. 

The strongest first-time development applications do not try to compensate for limited experience by taking more risk. 

They generally do the opposite. 

They surround the project with: 

appropriate expertise, credible numbers and sufficient financial resilience. 

The useful question is therefore not simply: 

“Will a lender finance a first-time developer?” 

It is: 

“What does this particular project need around it to give a lender confidence that it can be completed and the debt repaid?” 

That distinction matters. 

A track record can strengthen a development finance application. Where that track record does not yet exist, the quality of the structure around the first project becomes even more important. 

Important information 

This article is for general information only and does not constitute personal lending, development, investment, tax, legal or financial advice. 

Development finance availability, interest rates, fees, leverage, loan-to-cost, loan-to-GDV, borrower-equity requirements, guarantees, experience requirements, drawdown conditions and security depend on the borrower, development and lender at the relevant time. 

Gross Development Value, development costs, construction programmes, future sale proceeds and refinancing availability are estimates or future outcomes and are not guaranteed. 

First-time developers should obtain appropriate legal, planning, construction, tax and other professional advice relevant to their project. 

Development finance may be unregulated depending on the transaction. Any property or other asset used as security may be at risk if borrowing secured against it is not repaid.